Industrial Solar Installation in Gujarat | 3-Year Payback Promise
INDUSTRIAL SOLAR

Capabilities

Industrial Solar with a 3-Year Payback Promise

500+ factories across Gujarat run on Praveg Solar. We track your plant's generation — achieve payback in 3 years, or we pay you the penalty.

Capabilities

Financial Benefits for Industry

Direct Savings

  1. Grid power: ₹10+/unit
  2. Solar power: ₹2–3/unit
  3. Save up to 80% on your largest overhead

Tax Stack

  1. 40% accelerated depreciation
  2. GST input credit
  3. Corporate tax benefits
  4. Payback in 2.5–3.5 years for most plants

₹0 Upfront

  1. RESCO & PPA models available
  2. Zero-capex solar adoption
  3. Loan & EMI structuring options

Policy Advantage

  1. Gujarat solar policy supports industrial projects up to 5 MW
  2. Attractive tariff structures
  3. RECs provide an additional revenue stream

Latest Insights

Frequently Asked Questions

Get a free site survey, a custom system design and a transparent ROI report — no obligation.

Yes; our structures are engineered per site for vibration, wind and dust conditions
From 100 kW rooftops to multi-MW captive plants, rooftop and ground-mounted.
Generation is tracked against the committed baseline; shortfall triggers the contractual penalty in your favour. Full terms in the proposal.
Yes; we design hybrid captive setups — see Ground-Mounted Solar.

Ready to Cut Your Electricity Bill?

Get a free site survey, a custom system design and a transparent ROI report — no obligation.